PROJECTS
RECENT PROJECTS
Irontech Inc., invites you to review our vast and versatile portfolio and current projects. Projects that has earned us our place in the steel fabrication industry throughout the Caribbean and US Virgin Islands.
- all projects
- fabrication
- surface preparation & painting
- repair
- replacement
- fire protection system
-
AEE AGUIRRE MODULES
Puerto Rico
-
REPLACEMENT
-
PROJECT MANAGEMENT
Replacement of Once Through Steam Generators (OTSG) with all the ancillary equipment. Project completed with a very tied schedule of 22 calendar days. All work completed in accordance with applicable requirements of NBIC.
-
-
COOPERVISION STRUCTURE
Puerto Rico
-
STEEL FABRICATION
-
PROJECT MANAGEMENT
Fabrication and erection of steel structure for tanks, pumps and other equipment.
-
-
HELICONES
Puerto Rico
-
STEEL FABRICATION
-
PROJECT MANAGEMENT
Fabrication and erection of helicones, a conical structure made of stainless steel being the first helicone ever erected by a local company (previously fabricated and erected by RGE). Work successfully completed.
-
-
VI WAPA 60" HEADER
Virgin Island
-
Fabrication
-
MANAGEMENT
-
installation
Fabrication and installation of 5/8" x 60" x 20'-0" water header with 60", 30" (2ea.) and 24" (3ea) nozzles. All work done using the latest welding technology available. Work done at our shop and installation done in Virgin Island.
VIEW PROJECT -
-
AEE PALO SECO PLANT FIRE PROTECTION SYSTEM
Puerto Rico
-
Fabrication
-
MANAGEMENT
-
installation
Fabrication and installation of pipe support, foam chambers, pipe surface preparation and valves installation of all the main lines and branches for the Reserve System, Services System, Distillate System, Hose Line Systems, Pump Station Lines, LDO Pump Station, Foam House.
-
-
AEE AGUIRRE AIR INLET DUCT SYSTEM
Puerto Rico
-
Fabrication
-
surface preparation & painting
-
MANAGEMENT
Fabrication of new air inlet duct system for a GE MS7001 Gas Turbine in AEE Aguirre Plant that includes two main duct sections with silencers and transitions ducts, surface preparation and painting.
-
-
AEE AGUIRRE CONDENSER WATER BOXES
Puerto Rico
-
Replacement
-
MANAGEMENT
Replacement of condenser water boxes, in this project we faced the challenge of wrong weight given by owner, boxes were indicated with weight of 29,000 pounds and the real weight was 58,000.00 pounds, Irontech made a strategy change and correct in place all the custom made structure to lift and move these huge boxes with limitation everywhere, most part of these limitations were lines in operation. The result a work done before any other customer during this shutdown, another proof that in our case the harder the challenge the better the results.
-
-
PUMA TANK 80
Puerto Rico
-
Repairs
-
MANAGEMENT
Repairs of 80'-0" diameter by 40'-0" high tank. Scope includes bottom patching, fabrication and installation of new nozzles, installation of insert plates, inside surface preparation and painting, outside surface preparation and painting. All work done in record time with an unsurpassed degree of customer satisfaction.
-
-
COSTA SUR CHANNEL REHABILITATION
Puerto Rico
-
excavation
-
compaction
-
fabrication & installation
Irontech was main starring at the rehabilitation of the discharge channel of Costa Sur Power Plant, scope includes excavation, compaction, rebar fabrication and installation, forming, concrete pours, removal of existing steel members, fabrication and erection of FRP members. All the work done with the power plant in operation and with water temperature exceeding 120F.
-
-
PUMA NORTH AND SOUTH BULLETS
Puerto Rico
-
repairs
-
fire protection system
-
surface preparation & painting
The most challenging project ever done in Puerto Rico rehabilitating 27 propane bullets, scope of work includes nozzles repairs, nozzles replacement, pitting repairs, manways replacement, fire protection systems, access platforms fabrication and erection, site grading, concrete bases rehabilitation, surface preparation and painting.
-
-
PUMA TANK 502 MAJOR REPAIRS
Puerto Rico
-
Major overhaul
-
fabrication & installation
Major overhaul of 100'-0" diameter by 40'-0" high API tank. Scope includes sand replacement, liner installation, leak detection system fabrication and installation, annular ring fabrication and installation, bottom erection, new roof structure fabrication and erection, new roof deck, fabrication and erection of fire protection system, fabrication and erection of cooling rings, fabrication and installation of new nozzles, installation of insert plates, inside surface preparation and painting, outside surface preparation and painting.
-
-
REPAIR OF PEERLESS - TANK 3
Puerto Rico
-
Repair
-
replacement
Repairs that includes bottom replacement and floating roof repairs.
-